ABB IRB 1300 Product Manual page 314

Hide thumbs Also See for IRB 1300:
Table of Contents

Advertisement

5 Repair
5.5.1 Replacing the lower arm
Continued
4
Removing the axis-3 timing belt
1
2
3
4
5
Continues on next page
314
Action
Pull the cable package out to the swing support.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
145.
CAUTION
Loosening timing belts will release axes. This
means the axes can fall down.
Make sure axes are well supported before
loosening timing belts.
CAUTION
The upper arms, which includes housing, extender
unit (only for IRB 1300-7/1.4 and IRB 1300-12/1.4),
tubular and tilt unit weighs 17 kg.
All lifting accessories used must be sized accord-
ingly!
Fit a roundsling to the upper arm to support the
weight (no force).
© Copyright 2020-2022 ABB. All rights reserved.
Note
xx2000001683
Note
Product manual - IRB 1300
3HAC070390-001 Revision: G

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents