ABB IRB 1300 Product Manual page 477

Hide thumbs Also See for IRB 1300:
Table of Contents

Advertisement

3
4
Refitting the axis-6 timing belt
1
2
3
4
Product manual - IRB 1300
3HAC070390-001 Revision: G
Action
Orient the motor correctly and fit it into the tubular.
Tip
Leave the axis-6 motor connectors accessible
from the tubular support side.
Refit the screws and washers.
Note
Do not tighten the screws yet.
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
Install the timing belt to the pulleys and verify that
the belt runs correctly in the grooves of the pul-
leys.
Move the motor to achieve proper belt tension.
Use a sonic tension meter to measure the timing
belt tension.
If the timing belt tension does not meet the require-
ment, loosen the motor screws and readjust.
© Copyright 2020-2022 ABB. All rights reserved.
5.5.3 Replacing the tubular and tilt unit
Note
Motor orientation: orient the motor
according to the figure below, in
regard to the encircled motor con-
nector.
xx2000001603
Screw: M5x16 12.9 Lafre
2C2B/FC6.9 (4 pcs)
xx2000001601
Note
xx2000001600
Used belt: 85.7-91.6 Hz
New belt: 102-107 Hz
Continues on next page
5 Repair
Continued
477

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents