Delta ASDA-A3 Series User Manual page 251

Hide thumbs Also See for ASDA-A3 Series:
Table of Contents

Advertisement

Motion Control
Speed command followed by a Speed command
When the PR executor receives two consecutive Speed commands, if they do not have
Interrupt or Overlap functions, the PR executor issues the first Speed command to the motion
command generator, and the generator starts the first part of speed control. After the first Speed
7
command completes, if no delay time is set, the PR executor issues the second Speed
command for the generator to start the second part of speed control (see Figure 7.1.6.3 (a)).
If the first Speed command includes a delay, the PR executor starts counting the delay time
right after the motor reaches the target speed. Then it issues the second Speed command for
the generator to start the second part of speed control as shown in Figure 7.1.6.3 (b).
PR
executor
Motion
command
generator
PR
executor
Motion
command
generator
7-54
(1 ms command cycle)
(1 ms command cycle)
PR#1
Speed
DLY=[0] 0 ms
100 rpm
Acc=[11] 100 ms
Dec=[11] 100 ms
Speed (rpm)
500
100
(a) Speed command without delay
(1 ms command cycle)
PR#1
Speed
DLY=[1] 100 ms
100 rpm
Acc=[11] 100 ms
Dec=[11] 100 ms
Speed (rpm)
500
100
(b) Speed command with delay
Figure 7.1.6.3 Speed sequence command
PR#2
Speed
DLY=[0] 0 ms
500 rpm
Acc=[0] 33.3 ms
Dec=[0] 33.3 ms
(1 ms command cycle)
PR#2
Speed
DLY=[0] 0 ms
500 rpm
Acc=[0] 33.3 ms
Dec=[0] 33.3 ms
100 ms
ASDA-A3
Time
Time

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecm-a3 series

Table of Contents