Avaya S8700 Maintenance Manual page 2051

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

PRI-CDR/SEC-CDR (Call Detail Recording Link)
e. Software detects an overflow of CDR records generated in the switch due
to the heavy trunk traffic and low speed CDR output device. If both primary
and secondary links are ON, the secondary link is torn down temporarily for
two minutes to speed up the output process to the primary link. No action
is necessary for this error type.
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. For example, by clearing error codes associated with the
Link Tear Down test (#213), you may also clear errors generated from other tests
in the testing sequence.
Order of Investigation
Link Tear Down test (#213)
Link Retry test (#215)
1.
D = Destructive; ND = Nondestructive
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external CDR
output device. If the link has been disconnected already, this test just returns
PASS. Every resource allocated for a CDR link is released after this test.
Table 8-535. Test #213 Link Tear Down Test
Error
Test
Code
Result
Description / Recommendation
40
ABORT
Internal system error.
50
ABORT
Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
1010
ABORT
The CDR link has been busied out to out-of-service.
1. Enter the release cdr primary | secondary command to release the CDR
2. Retry the test cdr primary | secondary long command to execute the
555-233-143
Short Test
Sequence
X
link from busyout state.
test.
Long Test
1
Sequence
D/ND
X
D
X
ND
Continued on next page
Issue 1 May 2002
8-1329

Advertisement

Table of Contents
loading

Table of Contents