Maintenance-Object Repair Procedures
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. For example, by clearing error codes associated with the
NPE Crosstalk test (#6), you may also clear errors generated from other tests in
the testing sequence.
Order of Investigation
Speech Synthesis PSS Handshake test (#168)
NPE Crosstalk test (#6)
Conference Circuit test (#7)
Speech Synthesis DTMF Receiver test (#163)
Speech Synthesis Memory test (#166)
Speech Synthesis DSP Tone test (#165)
Speech Synthesis SSD Inquiry test (#167)
Speech Synthesis DTMF Receiver Inquiry test (#164)
Speech Synthesis Parameter Update test (#169)
1.
D = Destructive, ND = Nondestructive
NPE Crosstalk Test (#6)
The NPE Crosstalk test verifies that this port's NPE channel talks on the selected
time slot and never crosses over to time slots reserved for other connections. If
the NPE is not working correctly, one-way and noisy connections may occur. This
test is usually only part of a port's long test sequence and takes about 20 to 30
seconds to complete.
Table 8-556. TEST #6 NPE Crosstalk Test
Error
Test
Code
Result
Description / Recommendation
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
1000
ABORT
System resources required to run this test are not available. The port may be
busy with a valid call and therefore unavailable for certain tests. Wait until the
port is idle (amber LED is off) before retesting.
1. If the port is idle, retry the command at 1-minute intervals up to 5 times.
8-1366
Issue 1 May 2002
Short Test
Long Test
Sequence
Sequence
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Continued on next page
1
D/ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
555-233-143

Advertisement

Table of Contents
loading

Table of Contents