Rep 5.5 Bind Path Motor Replacement M3 - GBC eWire Service Manual

Table of Contents

Advertisement

REP 5.5 Bind Path Motor Replacement M3

PARTS LIST ON PL 5.16
Use this procedure to remove and install Bind Path Motor
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
Removal Procedure
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 5.1
Deflector Module Replacement
Module.
4. Loosen the Set Screw on the Motor Pulley.
5. Disconnect the Motor Cable.
GBC eWire
to remove the Deflector
01/26/2018
4-121
6. Disconnect the stepper motor by loosening the M3 Screws (4).
Remove the Pulley from the Motor shaft and remove the old Motor.
Installation Procedure
1. Position the motor in place on the Motor Bracket and slide the Pulley
onto the Motor shaft.
2. Tighten the M3 Screws (4) to attach the motor.
3. Tighten the set screw to secure the Pulley
4. Do REP 5.1
Deflector Module Replacement
Module.
5. Connect the Power Cord.
6. Power ON the eWire.
to Install the Deflector
Repairs/Adjustments

Advertisement

Table of Contents
loading

Table of Contents