Rep 4.9 Stacker Drive Belt Replacement - GBC eWire Service Manual

Table of Contents

Advertisement

REP 4.9 Stacker Drive Belt Replacement

PARTS LIST ON PL 5.15
Use this procedure to remove and install the Vacuum Stacker Drive Belt.
Removal Procedure
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 4.1
Vacuum Stacker Module Replacement
Vacuum Stacker.
4. Do REP 4.5
Motor Replacement, Vacuum Stacker Drive (M5)
remove the Vacuum Stacker Drive Motor.
5. Slide the Drive Belt off the Pulley and remove from the module.
GBC eWire
Installation Procedure
1. Place the new Belt around the Shaft Pulley and loosely wrap it
2. Do REP 4.5
3. Check the belt tension on the Drive Belt and adjust if necessary.
4. Ensure all Pulley set screws are tightened.
5. Do REP 4.1
6. Connect the Power Cord
7. Turn on the eWire.
to remove the
to
01/26/2018
4-113
around the Motor pulley.
Motor Replacement, Vacuum Stacker Drive (M5)
install the Vacuum Stacker Motor.
Vacuum Stacker Module Replacement
Vacuum Stacker.
to
to replace the
Repairs/Adjustments

Advertisement

Table of Contents
loading

Table of Contents