GBC eWire Service Manual page 156

Table of Contents

Advertisement

6. Remove the M4 Nuts (2) mounting the sub-assembly
7. Remove the entire Disengaging Roller #3 sub-assembly
Repairs/Adjustments
Installation Procedure
1. Place the new 7717128 sub-assembly onto the appropriate
mounting studs on the panel surface.
2. Tighten the M4 nuts (2) to secure the sub-assembly.
3. Do REP 2.4
Idler Roller Replacement, Paper Path
Idler Roller Assembly.
4. Install the Cable to the headers on the new sub-assembly.
5. Do REP 1.1
Top Cover Replacement
6. Connect the Power Cord
7. Turn ON the eWire.
01/26/2018
4-40
to install the
to replace the Top Cover.
GBC eWire

Advertisement

Table of Contents
loading

Table of Contents