Rep 8.16 Holder Lock Solenoid, L8 - GBC eWire Service Manual

Table of Contents

Advertisement

Installation Procedure
1. Reverse the steps in the Removal Procedure.
2. Connect the Power Cord
3. Turn power ON to eWire.

REP 8.16 Holder Lock Solenoid, L8

PARTS LIST ON PL 5.22
GBC eWire
Use this procedure to remove and install the Holder Lock Solenoid L8.
Note that this procedure applies to both solenoids on the Holder.
Removal Procedure
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Open the Lid and Lower Bypass.
4. Locate the Holder Lock Solenoid(s) on the Holder Lock Sub-
Assembly.
5. Disconnect the Solenoid Cables at the header.
6. Using a flat head screwdriver, remove the E-Ring securing the Link
Pin. Remove the Link Pin from the Solenoid Assembly.
01/26/2018
4-159
WARNING
Repairs/Adjustments

Advertisement

Table of Contents
loading

Table of Contents