GBC eWire Service Manual page 49

Table of Contents

Advertisement

4. Do GP 6.4 to check sensor S1, S12, 13, 15, 6, 7, 8, 9, 10 and 41.
This clears the fault
Yes- Return to normal operation
5. Do GP 6.5 to check motors M1, M16, M17 and M18.
This clears the fault
Yes- Return to normal operation
6. Do GP 6.6 to inspect solenoids L2, L3 and L4.
This clears the fault
Yes- Return to normal operation
7. Inspect rollers N1, N2, N3, N4, N5 and N6- GP 6.14
This clears the fault
Yes- Return to normal operation
8. Inspect the paper transport latch, if necessary perform adjustment.
Ensure the paper transport is securely closed.
This clears the fault
Yes- Return to normal operation
9. Inspect the transition from the Steering module section to the
subsequent section. The steering module lower panel and transport
module lower panel should be in line with each other.
The panels are in line with each other
Yes- Go to Step 7
No- Using REP 6.21 Steering module replacement, make the
necessary adjustments.
10. Do GP 6.3.7 FIRMWARE UPGRADE Procedure to Re-flash the
firmware for eWire.
This clears the fault
Yes- Return to normal operation
GBC eWire
No-
Go to Step 4
No-
Go to Step 5
No-
Go to Step 7
No-
Go to Step 6
No- Go to Step 7
No-
Escalate to second level
RAP 3.6.3 First jammed sheet before the deflector module
Follow the below procedure when the first jammed sheet is before the
Deflector module
1. Check for any obstructions in the paper path leading to the deflector
module
This clears the fault
Yes- Return to normal operation
2. Do GP 6.2.3 to confirm that the paper size setting is set to the sheets
being bound.
This clears the fault
Yes- Return to normal operation
01-26-2018
2-25
No-
Go to Step 2
No-
Go to Step 3
RAPS

Advertisement

Table of Contents
loading

Table of Contents