GBC eWire Service Manual page 442

Table of Contents

Advertisement

12. Remove the blocks and bolts from the element feeder drawer.
Place the ramp support blocks under the pallet, lining up the holes
in the blocks with the holes in the pallet.
13. Place the wooden ramp onto the appropriate location on the front
of the pallet. Secure the ramp in place using 2 long screws or Allen
wrenches.
GBC eWire
Secure the ramp
using screws
provided
01/26/2018
14. Using two people, carefully push the eWire from the back down
the ramp. Make sure the eWire casters stay on the pallet and the
ramp and control the machine on the way down. Make sure to
support the eWire carefully while moving due to its weight.
15. Open the top cover and lift the lower bypass panel. Remove the
shipping material in the book draw so that the drawer can open.
Open the book drawer and remove the contents. Check all the
parts are present before proceeding.
4 POWER CORDS, DANISH 771589, SWITZ. 7714334,
EUROPE
UK 7714333, AND CONTINENTAL EU 7714332
NORTH
1 POWER CORD 6200001
AMERICA
7718353
DOCKING BRACKET ASSY, UPSTREAM
7716523
CD, USER AND INSTAL. MANUALS, EWIRE
7610500
CABLE ASSY, INTERFACE (37 PINS)
1824402
HEX BOLT, M10 X 40
7718072
MAGNET, EWIRE, SPOOL
7723152
WIRE CUTTERS
7717288
DOCKING BRACKET ASSY, DOWNSTREAM
1823906
SCREW, PHILLIPS HX HD W/SEMS M5 X 10
7717879
TOOL, PUNCHED HOLE POSITION CHECK
7717881
EWIRE SETUP TOOL ASSEMBLY, ELEMENT HEIGHT
7709668
SCREW, CARRAIGE, 5/16-18X4"
7723183
SUPPORT, PACKING, EWIRE
8-5
Installation Instructions

Advertisement

Table of Contents
loading

Table of Contents