Rep 2.19 Solenoid Replacement, Disengaging Roller #1 And #2 (L2 & L3) - GBC eWire Service Manual

Table of Contents

Advertisement

REP 2.19 Solenoid Replacement, Disengaging Roller #1 and #2 (L2 &
L3)
PARTS LIST ON PL 5.3
Use this procedure to remove and install the Disengaging Roller #1 and
#2 Solenoids. Solenoids L2 and L3 are part of the same sub-assembly
(7717125) and must be replaced together.
Removal Procedure
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 1.1
Top Cover Replacement
4. Do REP 2.4
Idler Roller Replacement, Paper Path
Roller Assembly on the left and right side of the Disengaging Roller
#1 and #2 sub-assembly (7717125).
5. Disconnect the Cables at the header and remove Cables from the
wire clamps on the sub-assembly.
Repairs/Adjustments
to remove the Top Cover.
to remove the Idler
6. Remove the M4 Nuts (2) from the sub-assembly.
7. Remove the sub-assembly.
01/26/2018
4-38
GBC eWire

Advertisement

Table of Contents
loading

Table of Contents