6. Remove the Timing Pulley by sliding it off the shaft.
GBC eWire
Installation Procedure
1. Place the Timing Pulley in position on the Shaft and install the
retaining ring.
2. Do REPs 2.8 & 2.9
Bypass Timing Belt #1 Replacement & Bypass
Timing Belt #2 Replacement
3. Do REP 1.1
Top Cover Replacement
4. Connect the Power Cord.
5. Power ON the eWire.
01/26/2018
4-23
to install the appropriate Timing Belts.
to install the Top Cover.
Repairs/Adjustments