GBC eWire Service Manual page 240

Table of Contents

Advertisement

7. Using a flat head screwdriver, remove the E-Ring securing the
Solenoid Linkage Pin.
8. Using an adjustable wrench, loosen the nut securing the Solenoid to
the Solenoid Mounting Bracket and remove the Solenoid linkage.
Repairs/Adjustments
Installation Procedure
1. Install the Solenoid to the Solenoid Mounting Bracket by tightening
the nut. Note the orientation of the linkage assembly relative to the
link pin on the Deflector.
2. Position the Solenoid Bracket in place and connect the Solenoid
Linkage to the Link Pin using the E-Ring.
3. Tighten the M3 Screws (3) to attach the Solenoid Mount Bracket to
the Deflector Frame.
4. Connect the Solenoid Cable.
5. Install the Solenoid Cover Plate by securing the M3 Screws (3).
6. Do REP 5.1
Deflector Module Replacement
Module.
7. Connect the Power Cord.
8. Power ON the eWire.
01/26/2018
4-124
to Install the Deflector
GBC eWire

Advertisement

Table of Contents
loading

Table of Contents