Rep 5.9 Deflector Drive Roller Assembly Replacement - GBC eWire Service Manual

Table of Contents

Advertisement

REP 5.9 Deflector Drive Roller Assembly Replacement

PARTS LIST ON PL 5.16
Use this procedure to remove and install the Deflector Drive Roller
Assembly, Nip N8.
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
Removal Procedure
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 5.1
Deflector Module Replacement
Module.
4. Remove the Outer Baffle Assembly by removing the M3 Screws (4).
5. Remove the Inner Baffle Assembly be removing the M3 Screws (4).
Set aside the right and left Baffle Mounting Brackets, noting the
orientation for re-assembly.
6. Do REP 5.5
Bind Path Motor Replacement M3
(M3).
7. Loosen the set screw on the Drive Shaft Pulley, and remove the
Pulley and Timing Belt.
8. Using a flat head screwdriver, remove the E-Ring and Washer from
both sides of the Drive Roller Assembly.
9. Remove the Bearings from each side of the Drive Roller Assembly.
10. Remove the Drive Roller Assembly.
Repairs/Adjustments
to remove the Deflector
to remove the Motor
Installation Procedure
1. Position the new Drive Roller Assembly into the brackets on the
Deflector Frame and install the Bearings.
2. Secure the Drive Roller Assembly by installing Washers and E-Rings
to each side.
3. Slide the Drive Pulley onto the end of the Drive Roller Shaft and
secure using the set screw.
4. Do REP 5.5
Bind Path Motor Replacement M3
5. Reverse the steps from the Removal Procedure to install the Inner
Baffle and Outer Baffle.
6. Do REP 5.1
Deflector Module Replacement
Module.
7. Connect the Power Cord.
8. Power ON the eWire.
01/26/2018
4-126
to install the Motor.
to Install the Deflector
GBC eWire

Advertisement

Table of Contents
loading

Table of Contents