Installation Procedure
1. Thread the M3 Screw and Nut through the end of the extension
spring and attach the Screw to the Holder. Secure it using the M3
Nut.
2. Repeat the Procedure to secure the opposite end of the spring.
3. If necessary, use the same process to replace the Holder Gates
Spring Lower on the opposite side of the Holder.
4. Connect the Power Cord
5. Turn power ON to eWire.
GBC eWire

REP 8.14 Holder Gates Spring Upper Replacement

PARTS LIST ON PL 5.21
Use this procedure to remove and install the Holder Gates Spring Upper.
Note that this procedure applies to the extension springs on the front and
rear sides of the Holder.
Removal Procedure
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Open the Lid and Lower Bypass.
4. Remove the M3 Screw and Nut to release the end of the extension
spring.
5. Repeat the procedure to remove the M3 Screw and Nut at the
opposite end of the extension spring. Remove the old spring.
6. If necessary, use the same process to remove the Holder Gates
Upper Spring on the opposite side of the Holder.