Rep 2.20 Solenoid Replacement, Disengaging Roller #3 (L4) - GBC eWire Service Manual

Table of Contents

Advertisement

Installation Procedure
1. Place the new 7717125 sub-assembly onto the appropriate
mounting studs on the panel surface.
2. Tighten the M4 nuts (2) to secure the sub-assembly.
3. Do
REP 2.4
Idler Roller Replacement to install the Idler Roller
Assemblies (2).
4. Install the Solenoid Cables to the headers on the new sub-
assembly, and secure the cables using wire clamps.
5. Do REP 1.1
Top Cover Replacement
6. Connect the Power Cord
7. Turn on the eWire.
GBC eWire
to replace the Top Cover.
01/26/2018

REP 2.20 Solenoid Replacement, Disengaging Roller #3 (L4)

PARTS LIST ON PL 5.3
Use this procedure to remove and install the Disengaging Roller #3
Assembly (7717128)
Removal Procedure
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 1.1
Top Cover Replacement
4. Do REP 2.4
Idler Roller Replacement, Paper Path
Roller Assembly from the Disengaging Roller Assembly.
5. Disconnect the Cable at the header.
4-39
WARNING
to remove the Top Cover.
to remove the Idler