Rep 5.10 Deflector Idler Roller Assembly Replacement - GBC eWire Service Manual

Table of Contents

Advertisement

REP 5.10 Deflector Idler Roller Assembly Replacement

PARTS LIST ON PL 5.16
Use this procedure to remove and install the Deflector Idler Roller
Assembly, Nip N8.
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
Removal Procedure
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 5.1
Deflector Module Replacement
Module.
4. Lift the Extension Spring (2) up off the Bearing Housing (2) at each
end of the Idler Roller Shaft. Unhook the ends of the extension spring
from the Bushing Forks.
GBC eWire
to remove the Deflector
01/26/2018
4-127
Idler Roller
Shaft
Retaining
Spring
5. Remove the Idler Roller with the Bearing Housings (2) from the
Bushing Forks.
Idler Roller
Bearing
Repairs/Adjustments

Advertisement

Table of Contents
loading

Table of Contents