GBC eWire Service Manual page 147

Table of Contents

Advertisement

8. Disconnect the Cable from the Skew Sensor Array PCB.
9. Release the Skew Sensor PCB by removing the M3 Nuts (4)
10. Remove the old Skew Sensor PCB from the Upper Bypass.
GBC eWire
Installation Procedure
1. Place the new Skew Sensor PCB onto the Upper Bypass by aligning
it with the M3 studs. Ensure that S6 is oriented at the rear of the
machine and S10 is oriented at the front of the machine.
2. Tighten the M3 Nuts to secure the PCB.
3. Connect the Sensor Cable to the PCB.
4. Install the Skew Sensor Cable into the cable clamps.
5. Install the Skew Sensor Cover by securing the M3 Screws.
6. Do REP 1.1
Top Cover Replacement
7. Connect the Power Cord.
8. Power ON the eWire.
01/26/2018
4-31
to install the Top Cover.
Repairs/Adjustments

Advertisement

Table of Contents
loading

Table of Contents