Rep 4.4 Solenoid Replacement, Drag Finger Solenoid (L6) - GBC eWire Service Manual

Table of Contents

Advertisement

Installation Procedure
1. Reverse the steps from the Removal Procedure. Ensure that the
kick-down retract rod is installed around the leg on the Kick-Down
Solenoid Assembly.
2. Do REP 4.1
Vacuum Stacker Module Replacement
Vacuum Stacker.
3. Connect the Power Cord
4. Turn on the eWire.
GBC eWire

REP 4.4 Solenoid Replacement, Drag Finger Solenoid (L6)

PARTS LIST ON PL 5.14
Use this procedure to remove and install the Drag Finger Solenoid
Removal Procedure
to install the
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 4.1
Vacuum Stacker.
4. Loosen (4) M3 Screws securing the Port Cover and remove it.
01/26/2018
4-103
WARNING
Vacuum Stacker Module Replacement
to remove the
Repairs/Adjustments

Advertisement

Table of Contents
loading

Table of Contents