GBC eWire Service Manual page 276

Table of Contents

Advertisement

7. Remove the M3 Screw securing the Solenoid Clamp to the Holder
Lock Sub-Assembly.
8. Remove the Solenoid.
9. Repeat the same procedure for the second L8 Solenoid.
Installation Procedure
Repairs/Adjustments
1. Insert the new Solenoid into the Solenoid Clamp and position it to
the Holder Lock Assembly. Secure the Solenoid Clamp using the
M3 Screw.
2. Thread the Link Pin through the Solenoid plunger and the Holder
Lock Sub-Assembly bracket. Secure the Link Pin by attaching the
E-Ring.
3. Connect the Solenoid Cable and secure the wires using the cable
clamps.
4. Repeat the Process to install the second L8 Solenoid.
5. Connect the Power Cord
6. Turn power ON to eWire.
01/26/2018
4-160
GBC eWire

Advertisement

Table of Contents
loading

Table of Contents