Rep 2.7 Belt Drive Timing Pulley Replacement - GBC eWire Service Manual

Table of Contents

Advertisement

Installation Procedure
1. Place the new Idler Pulley onto the standoff.
2. Install the Washer and the E-Clip.
3. Do REPS 2.8 or 2.9
Bypass Timing Belt #1 Replacement & Bypass
Timing Belt #2 Replacement
4. Do REP 1.1
Top Cover Replacement
5. Connect the Power Cord.
6. Power ON the eWire.
Repairs/Adjustments
to replace the Timing Belt.
to replace the Top Cover.

REP 2.7 Belt Drive Timing Pulley Replacement

PARTS LIST ON PL 5.4
Use this procedure to remove and install the Timing Pulley.
Removal Procedure
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 1.1
Top Cover Replacement
4. Do
REP 2.8
or
REP 2.9
to remove the Timing Belt.
5. Remove the retaining ring from the roller shaft.
01/26/2018
4-22
to remove the Top Cover.
GBC eWire

Advertisement

Table of Contents
loading

Table of Contents