Rep 2.6 Belt Drive Idler Pulley Replacement - GBC eWire Service Manual

Table of Contents

Advertisement

Installation Procedure
1. Place the new Steering Idler Roller Assembly into the Bearing Mount
Brackets on the Steering Module.
2. Make sure the flat faces of the Bearings align with the slot on the
Bearing Mount Brackets.
3. Rollers are non-directional so it does not matter which end goes in
which bracket.
4. After the assembly is in place, gently pull the assembly outward and
release to ensure it moves freely in the housing.
5. Place the Extension Spring (2) over the Bearing hub (2).
6. Place the hooks on the ends of the Extension Springs (2) into the
mounting holes on the Bearing Mount Brackets.
7. Lower the Upper Bypass Panel
8. Connect the Power Cord.
9. Power ON the eWire.
GBC eWire

REP 2.6 Belt Drive Idler Pulley Replacement

PARTS LIST ON PL 5.4
Use this procedure to remove and install the Belt Drive Idler Pulleys
(7715383) on the rear of the Upper Transport.
Removal Procedure
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 1.1
Top Cover Replacement
4. Do REP 2.8
Bypass Timing Belt #1 Replacement
remove the Timing Belt.
5. Remove the E-Ring and the Spacer.
6. Slide the old Idler Pulley from the Standoff.
01/26/2018
4-21
WARNING
to remove the Top Cover.
or
REP 2.9
Repairs/Adjustments
to

Advertisement

Table of Contents
loading

Table of Contents