GBC eWire Service Manual page 228

Table of Contents

Advertisement

6. Loosen and remove the M5 Screws (2) securing the Vacuum shaft
rod. Remove the Hinge Brackets from the Vacuum Stacker.
Repairs/Adjustments
7. Do REP 4.6
Idler Pulley Assembly Replacement
Pulley Sub-Assembly (2).
8. Lift the Vacuum Drive Belt off the Idler Pulley and carefully slide
around and off the Vacuum Stacker.
9. Repeat the process to remove the other Vacuum Drive Belt.
Installation Procedure
1. Reverse the steps from the Removal Procedure.
2. Do REP 4.1
Vacuum Stacker Module Replacement
Vacuum Stacker.
3. Connect the Power Cord
4. Turn on the eWire.
01/26/2018
4-112
to remove the Idler
to install the
GBC eWire

Advertisement

Table of Contents
loading

Table of Contents