Rep 4.7 Kickdown Weldment Replacement - GBC eWire Service Manual

Table of Contents

Advertisement

REP 4.7 Kickdown Weldment Replacement

PARTS LIST ON PL 5.15
Use this procedure to remove and install the Kick-down weldments.
Removal Procedure
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
8. Switch power OFF to eWire.
9. Disconnect the Power Cord.
10. Do ARP 4.1
Vacuum Stacker Module Replacement
Vacuum Stacker.
11. Loosen the M3 Screws (2) and remove the lift handle.
GBC eWire
12. Using a flat head screwdriver, loosen and remove the gas spring
socket from the top cover.
to remove the
13. Loosen and remove the M3 Screws (4) securing the top cover and
remove the top cover. Carefully slide the top cover out under the
green belts.
01/26/2018
4-109
Repairs/Adjustments

Advertisement

Table of Contents
loading

Table of Contents