GBC eWire Service Manual page 226

Table of Contents

Advertisement

14. Loosen but do not remove the M3 Nuts (2) securing the Kick-Down
Weldment to the kick-down link shaft.
15. Slide the Kick-Down Weldment out through the bottom of the Vacuum
Module.
16. For the outer Kick-Down Weldment parts, remove the side cover(s) by
loosening the M3 screws (3) and remove the Plug to access the
screws to attach the Kick-Down Weldment.
Repairs/Adjustments
Installation Procedure
1. Reverse steps 7-9 of the Removal Procedure
2. After installing all 4 kick-downs, ensure that the flats of the skis
are in plane with each other when in the down position. If any are
out of plane, loosen the M3 Nuts securing it and reseat it in line
with the others.
3. Also ensure that when retracted, the kick-downs are below the
plane of the belts. If any are not, loosen the M3 Nuts holding the
protruding kick-down and reseat it.
4. Reverse steps 1-6 from the Removal Procedure.
5. Do ARP 4.1
Vacuum Stacker Module Replacement
Vacuum Stacker.
6. Connect the Power Cord
7. Turn on the eWire.
01/26/2018
4-110
to install the
GBC eWire

Advertisement

Table of Contents
loading

Table of Contents