Vertical Alignment - GBC eWire Service Manual

Table of Contents

Advertisement

9. Remove the 2 Locking Screws from the Docking Bracket and
loosen the 4 Adjustable Screws. Shift the Docking Face Plate by
the amount defined in Step 7. Secure the Adjustable Screws.
Repeat the steps above to dock the eWire again and ensure the
offset has been corrected.
10. Place the Downstream Docking Bracket under the downstream
side of the eWire so the pin side of the bracket is on facing
upstream.
11. Using the M5 screws provided, secure the bracket to the eWire
base. The mounting holes on the eWire base are slotted and the
brackets location can be adjusted. Refer to the install manual of
the downstream device for the positioning of this bracket.
GBC eWire

8.6. Vertical Alignment

1. With the eWire docked to the upstream device, look through the
gap on the upstream side of eWire. Confirm that the exit baffles of
the upstream device are aligned vertically with the infeed baffles of
the eWire.
2. If the eWire is not vertically level with the upstream device, undock
the eWire. Measure the height from the floor to the center of the
paper path on each side to determine how much adjustment is
needed.
3. Remove the side covers (REP 1.6) and raise or lower the eWire by
adjusting the casters (4 total). Loosen the jam nuts and then use a
socket wrench to raise or lower the caster.
4. After adjustment, refer to 8.7 Leveling Procedure. If the eWire is
not level, adjust the casters until it is level.
5. When the eWire has been raised or lowered by the amount of
offset measured between eWire and the upstream device, re-dock
the eWire and confirm that the input and output baffles are now
aligned. If additional adjustment is needed, repeat Step 2.
01/26/2018
8-9
Installation Instructions

Advertisement

Table of Contents
loading

Table of Contents