Rep 5.3 Sensor Replacement, Bind Kick Downs S2 - GBC eWire Service Manual

Table of Contents

Advertisement

REP 5.3 Sensor Replacement, Bind Kick Downs S2

PARTS LIST ON PL 5.16
Use this procedure to remove and install Bind Kick Downs Position
Sensor
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
Removal Procedure
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 5.1
Deflector Module Replacement
Module.
4. Locate the Bind Kick Downs Sensor S2. The sensor is located
between the Deflector frame plate and the curved baffle plate.
5. Disconnect the Sensor Cable.
6. Remove the Sensor Bracket by loosening the M3 Screws (2)
7. Remove the old Sensor by removing the M3 mounting screw.
GBC eWire
to remove the Deflector
01/26/2018
4-119
Installation Procedure
1. Install the new Sensor into the Sensor Bracket. Use the cutout to
align the sensor.
2. Attach the Sensor Bracket to the Deflector.
3. Connect the Sensor Cable to the new Sensor.
4. Do REP 5.1
Deflector Module Replacement
Module.
5. Connect the Power Cord.
6. Power ON the eWire.
7. Do GP 6.3.2 to verify sensor function.
to Install the Deflector
Repairs/Adjustments

Advertisement

Table of Contents
loading

Table of Contents