Honda ACCORD HYBRID 2005 Service Manual page 1045

Hide thumbs Also See for ACCORD HYBRID 2005:
Table of Contents

Advertisement

0 ©
27. Install shift solenoid valve B (brown connector) by
holding the shift solenoid valve body; make sure
the m o u n t i n g bracket contacts the accumulator
body.
28. Connect the YEL harness terminal to shift solenoid
valve A, the GRN harness terminal to shift solenoid
valve C, the RED harness terminal to shift solenoid
valve B, and the ORN harness terminal to shift
valve D.
29„ Install the shift solenoid valve cover, dowel pins,
and a new gasket.
30. Install the new solenoid valve body gasket on the
solenoid valve cover, and install the ATF pipes w i t h
the filter end in the transmission housing. Install
new O-rings over the ATF pipes.
3 1 . Install A/T clutch pressure control solenoid valve A
and B.
32. Secure the harness cover w i t h the bolt.
33. Check the connectors for rust, dirt, or oil, clean or
repair if necessary, then connect the connectors
securely.
34. Attach the shift cable end to the control lever, then
insert the control pin into the control lever hole
t h r o u g h the shift cable end, and secure the control
pin w i t h the spring clip/washer.
35. Secure the shift cable bracket.
36. Install the battery base.
37. Install the intake air duct and air cleaner housing.
38. Install the battery tray, battery, and battery hold-
d o w n bracket, then connect the battery terminals.
39. Enter the radio code (navigation code), then enter
the customer's audio presets, and set the clock.
40. Do the power w i n d o w control unit reset procedure
(see page 22-200).
4 1 . If the IMA battery level gauge (BAT) displays no
segments, start the engine in the P or N position,
and hold it between 3,500 and 4,000 rpm w i t h no
load until the BAT displays at least three segments.
14-209

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents