6 Calibration
6.3.1 Updating revolution counters on OmniCore robots
Continued
3
4
Continues on next page
782
Action
Remove the SMB assembly without disconnecting
the connectors.
Tip
Do this step to see the cable status more clearly.
Inspect the cable harness status.
The cable harness should be in vertical state
without twisting as shown in the figure.
© Copyright 2019-2022 ABB. All rights reserved.
Note
xx1800003567
xx1800003548
Product manual - IRB 910INV
3HAC068055-001 Revision: K