ABB IRB 910INV Product Manual page 255

Hide thumbs Also See for IRB 910INV:
Table of Contents

Advertisement

Removing the axis-1 timing belt
Use these procedures to remove the axis-1 timing belt.
Preparations before removing the axis-1 timing belt
Remove the robot from the wall or enough space.
1
2
3
4
Product manual - IRB 910INV
3HAC068055-001 Revision: K
Action
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
If there is no enough space for the maintenance
work, remove the robot from the wall and place it
on the maintenance bracket.
CAUTION
Do not lay down the robot during the transporta-
tion, always keep it straight.
If the robot lay down in any situation, the grease
may come out from gearbox.
Jog all axes to zero position.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safeguarded
space.
© Copyright 2019-2022 ABB. All rights reserved.
5.4.2 Replacing the axis-1 timing belt
Note
xx1800002825
Continues on next page
5 Repair
Continued
255

Advertisement

Table of Contents
loading

Table of Contents