ABB IRB 910INV Product Manual page 446

Hide thumbs Also See for IRB 910INV:
Table of Contents

Advertisement

5 Repair
5.6.4 Replacing the pulley on the ball screw lower position
Continued
Removing the pulley on the ball screw lower position
Use these procedures to remove the pulley.
Preparations before removing the pulley
Remove the robot from the wall.
1
2
Continues on next page
446
Action
If the robot is to be calibrated with refer-
ence calibration:
Find previous reference values for the axis
or create new reference values. These val-
ues are to be used after the repair proced-
ure is completed, for calibration of the ro-
bot.
If no previous reference values exist, and
no new reference values can be created,
then reference calibration is not possible.
If the robot is to be calibrated with fine
calibration:
Remove all external cable packages
(DressPack) and tools from the robot.
Action
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
If there is no enough space for the maintenance
work, remove the robot from the wall and place it
on the maintenance bracket.
CAUTION
Do not lay down the robot during the transporta-
tion, always keep it straight.
If the robot lay down in any situation, the grease
may come out from gearbox.
© Copyright 2019-2022 ABB. All rights reserved.
Note
Follow the instructions given in the refer-
ence calibration routine on the FlexPendant
to create reference values.
Creating new values requires possibility to
move the robot.
Read more about reference calibration for
Axis Calibration in
Reference calibration
routine on page
798.
Note
Product manual - IRB 910INV
3HAC068055-001 Revision: K

Advertisement

Table of Contents
loading

Table of Contents