ABB IRB 910INV Product Manual page 600

Hide thumbs Also See for IRB 910INV:
Table of Contents

Advertisement

5 Repair
5.6.10 Replacing the outer arm
Continued
Refitting the axis-4 second timing belt
1
2
3
Continues on next page
600
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free. See
Cut the paint or surface on the robot
before replacing parts on page 118
Note
After all repair work, wipe the Clean Room robot
free from particles with spirit on a lint free cloth.
Refit the timing belt to the pulley and the motor.
Ensure that the belt runs correctly in the grooves.
Install the axis-4 belt tension adjustment tool to
the motor.
Note
Just tighten the tool.
© Copyright 2019-2022 ABB. All rights reserved.
Note
xx1800002895
Timing belt:
3HAC061864-001
Belt tension adjustment tool set,
stage two of axis 4:-
xx1900000096
Product manual - IRB 910INV
3HAC068055-001 Revision: K

Advertisement

Table of Contents
loading

Table of Contents