ABB IRB 910INV Product Manual page 636

Hide thumbs Also See for IRB 910INV:
Table of Contents

Advertisement

5 Repair
5.7.1 Replacing the axis-1 motor sub-assembly
Continued
3
4
Refitting the axis-1 motor sub-assembly
Use these procedures to refit the axis-1 motor sub-assembly.
Refitting the axis-1 motor sub-assembly
1
Continues on next page
636
Action
Remove the screws and washers.
Remove the motor and the timing belt.
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free. See
Cut the paint or surface on the robot
before replacing parts on page 118
Note
After all repair work, wipe the Clean Room robot
free from particles with spirit on a lint free cloth.
© Copyright 2019-2022 ABB. All rights reserved.
Note
xx1800002870
Note
Product manual - IRB 910INV
3HAC068055-001 Revision: K

Advertisement

Table of Contents
loading

Table of Contents