ABB IRB 910INV Product Manual page 169

Hide thumbs Also See for IRB 910INV:
Table of Contents

Advertisement

2
3
Reconnecting the air hoses, CP/CS cabling and Ethernet cabling (if equipped)
1
2
Product manual - IRB 910INV
3HAC068055-001 Revision: K
Action
Insert the female head of the PB connector to the
bracket accordingly.
Tip
The mistake proofing measure has been applied
to the connectors, the connectors may be dam-
aged if excessive force is used.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
Reconnect the connector.
R2.PB
Tip
See the number markings on the connectors for
help to find the corresponding connector.
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free. See
Cut the paint or surface on the robot
before replacing parts on page 118
Note
After all repair work, wipe the Clean Room robot
free from particles with spirit on a lint free cloth.
Route the air hoses on the process hub behind
the protected bracket.
CAUTION
Correct cable routing is highly important.
If the cables are routed and secured incorrectly
the cables can be damaged.
© Copyright 2019-2022 ABB. All rights reserved.
5.3.2 Replacing the internal harness
Note
xx1900000069
xx1900000068
Note
Continues on next page
5 Repair
Continued
169

Advertisement

Table of Contents
loading

Table of Contents