ABB IRB 910INV Product Manual page 598

Hide thumbs Also See for IRB 910INV:
Table of Contents

Advertisement

5 Repair
5.6.10 Replacing the outer arm
Continued
3
4
5
6
Continues on next page
598
Action
Refit the timing belt to the pulley on the ball screw
and the motor. Ensure that the belt runs correctly
in the grooves.
Refit the screws and washers.
Use a sonic tension meter to measure the timing
belt tension.
If the timing belt tension does not meet the require-
ment, loosen the motor screws and readjust.
© Copyright 2019-2022 ABB. All rights reserved.
Note
Timing belt:
3HAC061862-001
xx1800002886
Screws: Hex socket head cap
screw M4x20 12.9 Lafre
2C2B/FC6.9 (3 pcs)
Washers: Washer 4.3x10x2 steel
(3 pcs)
Tightening torque: 3 Nm ±10%
xx1800002884
Used belt: 190-232Hz
New belt:225-287Hz
xx1800002887
Product manual - IRB 910INV
3HAC068055-001 Revision: K

Advertisement

Table of Contents
loading

Table of Contents