ABB IRB 910INV Product Manual page 191

Hide thumbs Also See for IRB 910INV:
Table of Contents

Advertisement

Removing the process hub
Use these procedures to remove the process hub.
Preparations before removing the process hub
1
2
3
4
Product manual - IRB 910INV
3HAC068055-001 Revision: K
Action
If the robot is to be calibrated with fine
calibration:
Remove all external cable packages
(DressPack) and tools from the robot.
Action
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
Jog all axes to zero position.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safeguarded
space.
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
© Copyright 2019-2022 ABB. All rights reserved.
5.3.3 Replacing the process hub
Note
118.
5 Repair
Continued
Note
xx1800002825
Continues on next page
191

Advertisement

Table of Contents
loading

Table of Contents