ABB IRB 910INV Product Manual page 303

Hide thumbs Also See for IRB 910INV:
Table of Contents

Advertisement

4
5
Removing the internal harness from the axis -2 gearbox position
1
2
3
Product manual - IRB 910INV
3HAC068055-001 Revision: K
Action
Remove the screws on the cable ferrule to release
the cable.
Disconnect the connectors.
R2.MP2
R2.FB2
Tip
Take photos of the connector and cable position
before disconnecting them, to have as a reference
when reconnecting.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
118.
Cut the cable straps for R2.MP3 and R2.MP4.
Tip
Take photos of the cable straps position before
cutting them, to have as a reference when routing
the cable.
© Copyright 2019-2022 ABB. All rights reserved.
5 Repair
5.5.1 Replacing the inner arm
Continued
Note
xx1800002876
xx1800002875
Note
Continues on next page
303

Advertisement

Table of Contents
loading

Table of Contents