ABB IRB 910INV Product Manual page 428

Hide thumbs Also See for IRB 910INV:
Table of Contents

Advertisement

5 Repair
5.6.3 Replacing the pulley on the ball screw upper position
Continued
5
Removing the upper cover
1
2
3
4
Continues on next page
428
Action
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
118.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
118.
For robots with protection class IP54 (option 3350-
540)
For robots with protection type Clean Room (op-
tion 3351-1)
Loose the locking screws.
For robots with protection class IP54 (option 3350-
540)
For robots with protection type Clean Room (op-
tion 3351-1)
Remove the upper cover from the ball screw.
© Copyright 2019-2022 ABB. All rights reserved.
Note
Note
xx1900001547
xx1900001548
Product manual - IRB 910INV
3HAC068055-001 Revision: K

Advertisement

Table of Contents
loading

Table of Contents