ABB IRB 910INV Product Manual page 435

Hide thumbs Also See for IRB 910INV:
Table of Contents

Advertisement

4
5
Refitting the pulley on the ball screw upper position
Use these procedures to refit the pulley.
Refitting the pulley on the ball screw upper position
1
2
Product manual - IRB 910INV
3HAC068055-001 Revision: K
5.6.3 Replacing the pulley on the ball screw upper position
Action
Remove the screws.
Remove the pulley carefully.
Tip
Hold the ball screw to prevent it from dropping.
Or the ball screw may be destroyed.
CAUTION
If the ball screw nut or ball screw spline nut go
out of the screw shaft, the ball screw is destroyed.
Be careful when you do any work that may cause
this.
Action
ELECTROSTATIC DISCHARGE (ESD)
The unit is sensitive to ESD. Before handling the
unit read the safety information in section
unit is sensitive to ESD on page
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free. See
Cut the paint or surface on the robot
before replacing parts on page 118
Note
After all repair work, wipe the Clean Room robot
free from particles with spirit on a lint free cloth.
© Copyright 2019-2022 ABB. All rights reserved.
Note
xx1800002862
Note
The
44.
5 Repair
Continued
Continues on next page
435

Advertisement

Table of Contents
loading

Table of Contents