After-Installation Inspection & Adjustment - Suzuki Baleno Manual

Sy413, sy416, sy418
Hide thumbs Also See for Baleno:
Table of Contents

Advertisement

5-86 BRAKES
1. LSPV lever
2. Spring
3. Adjusting nut
2) Torque each bolt and nut to specification as indicated respec-
tively in figure.
Tightening Torque
(a):23 N·m (2.3 kg-m, 17.0 lb-ft)
(b):16 N·m (1.6 kg-m, 11.5 lb-ft)
3) Upon completion of installation, fill reservoir tank with specified
fluid and bleed air from brake system.
4) After bleeding air, check that LSPV is installed properly, refer-
ring to the following "AFTER-INSTALLATION INSPECTION &
ADJUSTMENT".
AFTER-INSTALLATION INSPECTION &
ADJUSTMENT
Confirm the following before inspection and adjustment.
D Fuel tank is filled with fuel fully.
D Vehicle is equipped with spare tire, tools, jack and jack handle.
D Vehicle is free from any other load.
With vehicle in above conditions;
1) Place it on level floor.
2) Push up LSPV lever with finger till it stops and measure length
of coil spring ("L" in figure) as it is pulled.
3) Spring length "L" should be the value specified below.
Spring length "L"
3 Door : 165 mm (6.5 in.)
4 Door : 160 mm (6.3 in.)
WAGON : 150 mm (5.9 in.)
4) If it isn't, adjust it to specification by changing bolt (a) tightening
positions as shown. After adjustment, tighten adjusting nut to
specified torque.
Tightening Torque:
(a): 23 N·m (2.3 kg-m, 17.0 lb-ft)
NOTE:
Check to make sure that LSPV body and brake pipe joints
are free from fluid leakage. Replace defective parts, if any.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents