Removing Manifold Gauge Set - Suzuki Baleno Manual

Sy413, sy416, sy418
Hide thumbs Also See for Baleno:
Table of Contents

Advertisement

1. Manifold gauge set
4. Receiver/Dryer
2. High pressure side
5. Sight glass
(Delivery side hose)
6. Bubbles
3. Low pressure side
(Suction side hose)
6) After the system has been charged with specified amount (600
g, 21.0 oz) of refrigerant or when low and high pressure gauges
have indicated specified value below respectively, close low
pressure side valve of manifold gauge set. At this time, look into
the sight glass of receiver/dryer and check that there are no
bubbles in it, which means that the system is fully charged.
Low pressure gauge when charged with specified amount
About 245 kPa (2.5 kg/cm
High pressure gauge when charged with specified amount
About 1470 kPa (15 kg/cm

REMOVING MANIFOLD GAUGE SET

When A/C system has been charged with a specified amount of re-
frigerant, remove manifold gauge set as follows:
1) Close low pressure-side valve of manifold gauge set. (The high
pressure-side valve is closed continuously during the process
of charging.)
2) Close refrigerant container valve.
3) Stop engine.
4) Using shop rag, remove charging hoses from service valves.
This operation must be performed rapidly.
WARNING:
High pressure-side is naturally under high pressure.
So, care must be used to protect your eyes and skin.
5) Put caps on service valves.
AIR CONDITIONING (OPTIONAL) 1B-11
2
, 35.5 psi)
2
, 213 psi)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents