Installation
Column Installation Requirements
Installing the Column Rack
52
TRACE 1600/1610 Hardware Manual
Figure 55. Column Nut and Ferrules
b. Continue the installation of the capillary column following the instructions in the
section
"Installing the Column the First Time"
WARNING Before starting the installation, make sure that the GC is powered off and the
power cable is disconnected.
Before connecting the capillary column, make sure that the column rack is installed in the
oven. See
Figure
56.
SSL Injector
Ferrules
Column Nut
Detector
Ferrules
Column Nut
on
page
53.