Thermo Scientific TRACE 1600 Hardware Manual page 475

Gas chromatographs
Table of Contents

Advertisement

Thermo Scientific
Figure 437. Dual FPD Installation
a. Place the detector on its base body, ensuring that the Aluminum ring has been
inserted in the correct position, then tighten the fixing nut.
15. Connect the cables to the FPD detectors.
a. Connect the signal, excitation voltage and ignition/heating cables coming from the
control module installed into the back site to the primary FPD detector.
See
Figure
438.
Figure 438. Primary FPD Detector Cables Connection
Excitation Voltage Cable
b. Connect the signal, excitation voltage and ignition/heating cables coming from the
control module installed into the front site to the secondary FPD detector.
See
Figure
438.
Performing the Dual FPD Detector Configuration
Signal Cable
Ignition Heating Cable
TRACE 1600/1610 Hardware Manual
8
Installing Optional Kits
443

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trace 1610

Table of Contents