System Plumbing Checklists

Installing the Trap Column for KOH-Based Separations

Thermo Scientific
The system plumbing steps and the order in which they are performed vary slightly,
depending on the installed detector. The following checklists outline the steps for each
detection type.
CD system plumbing checklist
Install the trap column (only for KOH-based separations)
Fill and flush the regenerant path
Check the background conductivity
Complete the IQ and system function test
Complete the OQ (optional)
Flush and condition the electrolytic devices
Flush and install the columns
Complete the plumbing
Equilibrate the system
Install the Dionex QDC 300 (Capillary) (optional)
ED system plumbing checklist
Install the ED amperometry cell
Fill and flush the liquid path
Flush and condition the electrolytic devices
Complete the IQ and perform the system function test
Complete the OQ
Flush and install the columns
Complete the plumbing
Equilibrate the system
Installation of the Thermo Scientific Dionex Ion Pac™ ASTC 500 Anion Trap Column
(P/N 085359) is recommended for all KOH-based separations. The Dionex ASTC 500 trap
column removes trace contaminants from deionized water.
The trap column, as well as a tubing assembly (P/N 078497) for installing the trap column,
are provided in the Dionex ICS-4000 Ship Kit. The trap column installs between the pressure
transducer and the EGC inlet.
3
System Plumbing
System Plumbing Checklists
Dionex ICS-4000 Installation Instructions
27