9
Adding Modules
Adding a NPD Detector Module
476
TRACE 1600/1610 Hardware Manual
c. Using the cable provided, connect the signal connector on the NPD Thermionic
Source Power Module to the connector on the detector module. See
Figure 473. Signal Cable Connection
13. Remove the plug and connect the column end to the detector.
14. Open the gas supplies.
15. Check the gas supply for leaks.
a. Use a handheld electronic leak detector (Thermo Scientific GLD Pro leak detector or
equivalent) to check each fitting for leaks.
b. If you detect a leak, tighten the connection and retest it.
c. Repeat this process until all connections are leak free.
16. Plug the power cable to the AC input connector of the NPD Thermionic Source Power
Module, and to the wall outlet. The LED marked On blinks green.
IMPORTANT The NPD Thermionic Source Power Module must be powered at the same
line voltage of the main GC system.
If other external modules are present, plug the power cable to the AC Input connector of
each module, and to the wall outlet.
17. Power on the GC.
Figure
473.
Thermo Scientific