Configuration
Configure Application > Automatic Run > Load Dependent Start Stop ...
ID
Parameter
5756
Changes of
engines
254
CL
Setting range
Description
[Default]
2
Engine sequencing may be configured to start and stop engines according to
the time remaining until the maintenance hours counter (param‐
eter
The easYgen takes the time remaining on the maintenance hours counter
and divides it by the service hours group (32/64/128 h) configured in this
parameter to determine the individual unit's time group.
A generator with a larger time group number has more time remaining before
the maintenance hours timer expires and is considered to be the higher pri‐
ority generator.
If two generators are in the same time group, the configured generator
number determines which generator is the higher priority and will be started
first.
This functionality enables the end user to have multiple generators due for
service at approximately the same time.
[Off]
No engine change will be performed. The engines are selected according to
the setting of parameter
in case of load changes.
All 32/64/128 h
If parameter
engines with the same rated power and priority are changed, if it is configured
to "No", engines with the same priority are changed depending on the service
hours and generator number. All engines are divided into 32/64/128 service
hour groups. An engine change is performed if one engine changes to
another group in 32/64/128 hour spacing.
easYgen-2200/2500 | Genset Control
2550 Ä p.
327) expires (counter reaches 0 hrs).
5755 Ä p. 253
5754 Ä p. 253
(Fit size of engine) is configured to "Yes", only
(Fit service hours) with 1 hour spacing