The GCB is opened; the MCB is operated
depending on the setting of "Enable MCB"
(parameter
12923 Ä p.
206).
INTERCHANGE: Breaker logic "Soft loading / interchange synchronization"
The MCB and the GCB are synchronized, in order to avoid a dead busbar in this breaker logic mode. The operation of a breaker
under load is avoided by utilizing the ability to soft load. Continuous mains parallel operation is not possible with this breaker logic.
Following the shed-off request, the MCB synchronizes and closes, the generator soft unloads to the mains and the GCB opens. After
the GCB is open the engine is stopped following the expiration of the configured cool down period.
The GCB is opened; the MCB is operated
depending on the setting of "Enable MCB"
(parameter
12923 Ä p.
206).
Overview for application mode A03
STOP
PARALLEL: Breaker logic "Mains parallel"
This operation mode may be used both in the case of an isolated system, an isolated parallel system, and a system that is operated in
mains parallel.
The GCB is opened.
37535B
Configure Application > Configure Breakers > Transition Modes (Breaker ...
MANUAL
Synchronization of either the generator or
the mains can be initiated by pressing the
"GCB On" or "MCB On" push-button.
Synchronization of either the generator or
the mains can be initiated by pressing the
"GCB On" or "MCB On" push-button.
MANUAL
Mains parallel operation can be performed
via the "GCB On" push-button.
easYgen-2200/2500 | Genset Control
Configuration
AUTOMATIC
The GCB is synchronized via an add-on
request. After the GCB closes the MCB is
opened. Following the shed-off request
being issued, the MCB is synchronized
and closed. After the MCB has closed the
GCB is opened.
Emergency power: The emergency power
operation is terminated following the expi‐
ration of the mains settling time and the
MCB synchronizing to the generator. The
MCB closes and the GCB opens immedi‐
ately afterwards.
Via an engine request, the GCB is
synchronized and the generator power is
increased. The MCB is then opened. Fol‐
lowing the disabling of the engine request,
the MCB is reverse synchronized and the
GCB is then opened.
Emergency power: The emergency power
operation is terminated following the expi‐
ration of the mains settling time. The MCB
closes, the load is transferred, and the
GCB opens.
AUTOMATIC
The GCB is synchronized via an add-on
request and mains parallel operation is
performed.
When a shed-off request is issued, the
generator sheds load, the GCB is opened,
and the engine is shut down following the
configured cool down period.