ABB IRB 8700 Product Manual page 668

Hide thumbs Also See for IRB 8700:
Table of Contents

Advertisement

4 Repair
4.8.5 Replacing the axis-4 primary gearbox
Continued
6
Refitting the axis-4 primary gearbox
1
2
3
4
5
Continues on next page
668
Action
Inspect the o-rings.
Note
Replace if damaged.
Action
CAUTION
The axis-4 primary gearbox weighs 56 kg.
All lifting accessories used must be sized
accordingly.
Attach the lifting accessories to the gear-
box.
Fit the o-rings in its grooves.
Tip
Put some grease on the o-ring for a better
fitting.
CAUTION
Whenever parting/mating motor and gear-
box, the gears may be damaged if excess-
ive force is used.
Apply flange sealant.
© Copyright 2015-2020 ABB. All rights reserved.
Note
Note
Lifting accessory:
Roundsling 2 m: Lifting capacity: 5,000 kg
Loctite 574
Product manual - IRB 8700
3HAC052853-001 Revision: M

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 8700 - 550/4.20Irb 8700 - 800/3.50

Table of Contents