ABB IRB 8700 Product Manual page 591

Hide thumbs Also See for IRB 8700:
Table of Contents

Advertisement

Removing the motor flange
1
2
3
4
5
Product manual - IRB 8700
3HAC052853-001 Revision: M
Action
Remove two attachment screws in opposite
holes.
Fit guide pins in the holes.
Remove the remaining attachment screws
(22 pcs) and the six-hole washers (4 pcs).
Note
There will be some oil spill when the motor
flange is removed. Put some paper (or
similar) to absorb the surplus oil.
Use caution and move the motor flange out
over the guide pins.
© Copyright 2015-2020 ABB. All rights reserved.
4.8.3 Replacing the axis-2 gearbox
Note
Guide pin, M16x400
Always use guide pins in pairs.
Continues on next page
4 Repair
Continued
591

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 8700 - 550/4.20Irb 8700 - 800/3.50

Table of Contents